
What comes with the lot
More than the land.
The wires, the water, and the walk to the mailbox.
Fiber to every homesite from the day of occupancy, three-phase power in the corridor, twenty acres of shared open space at the center of the plat, curbside trash pickup as the houses go up, and a real entrance where the school bus pulls fully clear of the travel lane. What a lot comes with here, before you build.
Before the list
Most of this was somebody else's problem.
Internet · Fiber
Fiber to every lot.
Multi-gigabit from day one.
- Homesites served
- Service on day one
Power · Electric
Three-phase available at every homesite.

Water · Community system
Water you do not have to drill for.
Wastewater is the half that stays yours. Every lot carries its own septic system, permitted through Panhandle Health District, and six acres leaves it all the room it needs.

Trash pickup
The route arrives with the neighbors.
The entrance · Tract B
The first hundred feet belong to everybody.

The bus stop
A real school bus stop, drawn on the plans as its own turnout so the bus pulls fully clear of the travel lane. Winter mornings happen at the road with the neighbors, not at the end of a long driveway alone. Where the bus goes.
The mailboxes
Cluster mailboxes in the same turnout, one covered place a neighbor drives past anyway. Mail and packages land together instead of scattered down four streets of individual posts.
The information center
An entrance kiosk carrying the plat, the covenants, and the notices a neighbor is likelier to actually read on the walk to the mailbox than in an email.
Shown on the approved construction plans as Tract B, at the entrance. The rest of the land story →
The shared open space · Tract A
Twenty acres,
held in common.

- Shared open space
- Ridge lines
- Trailhead into IPNF
The pathways · on foot and on horseback
You ride out from home,
not from a trailer.
What we are not going to do is give you a mileage figure we have not measured. The pathway layout is an exhibit in the county file and it is a condition of the approval that it gets shown on the final plat alongside the road dedications. Until we can draw it accurately on the map on this site, the honest version is that the paths are required, they are maintained, and they connect the homesites to the shared ground rather than making you drive to it.
- Open to
- Maintained by
- Status
The Design Review Board
Written into the covenants.
Seated when the neighborhood is.
The rest of the land story
See the plat →Walk the commons.
Walk the timber.
The tracts are drawn on the ground already. Come see where the entrance is and where the open space begins.